Main Article Content
Abstract
The main objective of this study is to identify and select an electric submersible pump to produce high flow rates of oil. The electric submersible pump was chosen because it provides good flow rates in a given range. This electric submersible pump was used to raise production rates.
The study was conducted on two wells from Mellitah Oil Company in El Feel field and the results were as follows. Well (FD32) results were the required rate of 3283STB/d can be obtained using only 166 stages, while Well (FB18) results were 6180STB/d and 204 stages, and this required 2300V.
Keywords
Electrical Submersible Pump (ESP)
Pump
Well head
Alfeel Field
Morzuq Basine
Article Details
How to Cite
Fattouh, S. K., Alkeelani, S. H., & Bahroun, N. A. S. (2023). ELECTRICAL SUBMERSIBLE PUMPS (ESP) DESGIN OF WELLS (FD32) (FB18) NC-174, ALFEEL FIELD IN MORZUQ BASINE. Journal of Applied Science, 130–145. Retrieved from https://jas.sabu.edu.ly/index.php/JS/article/view/107
